This article is for the Fall 2024 Slurry Highway rework.
First video is overview of what the "Slurry Highway" is, and why we're replacing it.
This is an overview of the components you received and how double o-ring push-to-connect fittings differ from regular single o-ring PTC fittings.
These are the panels you will need to remove to access the slurry highway.
This is the first half of replacing the tubing - from the Ratio Control Chamber (Stir Chamber) through the coil on the back side of the lab.
This is the second half of replacing the tubing - from the slurry highway tees to the manifolds.
As the last video explains, once the rework is finished, we'll do some checks before starting to run samples. Don't hesitate to reach out with any questions during the process!